China Chengda Engineering Co., Ltd.

| English

1

Natural Gas Chemical, Coal Chemical and Downstream

2

Salt Chemical and Downstream

Petrochemical

3

Power Plant Energy

LNG/LPG Terminals

Municipal Engineering and Civil Buildings

About us
About us

Elaborate design, successful development

China Chengda Engineering Co. Ltd. (abbreviated as Chengda) is a wholly-owned subsidiary of China National Chemical Engineering Group Corporation Ltd, located in Chengdu, a famous cultural city in southwest China. It was formerly No. 8 Design Institute under the Ministry of Chemical Industry. Since its official founding in 1958, by decades of work and effort, Chengda has grown into an international integrated engineering-driven EPC contractor.

More
21 2020 ,Jan

Signing of World Largest Single Unit Bleaching Powder Project Contract

Recently, Chengda and Indonesia Sinar Mas Group signed two contracts for the design, procurement and technical service of two bleaching powder projects, with the product capacities of 60,000 MTPA and 30,000 MTPA respectively.

13 2020 ,Jan

Completion of Kaltim-2 2x125MW Coal-Fired Power Plant Project

At 22:00, Jan.12th of 2020, Unit 2 of Kaltim-2 Coal Fired Power Plant Project invested and EPC executed by Chengda in Indonesia, smoothly passed NDC (Net Dependable Capacity) and 168 hour reliability run with good performance, whose discharge is better than the designed discharge standard.

12 2019 ,Nov

The Unit 1 of Indonesia KALTIM-2 Coal-Fired Steam Power Plant Project Invested and Constructed by Chengda Successfully Achieved the Commercial Operation

At 15:30 local time on November 12, 2019, the Unit 1 of KALTIM-2 2?125MW BOOT coal-fired steam power plant in East Kalimantan of Indonesia, invested and constructed by China Chengda Engineering Co., Ltd. (hereinafter referred to as Chengda) of CNCEC passed the NDC (Net Dependable Capacity Test) and 168 hours of Reliability Test, and successfully entered the commercial operation.

11 2019 ,Nov

China’s First Exported Megawatt Electric Generating Unit Successfully Put into Commercial Operation

At 23:58 of Nov. 8th, 2019 Indonesia local time, the Indonesia Cilacap Phase III ultra-supercritical megawatt coal-fired power plant, which was undertaken by China Chengda Engineering Co. Ltd. of China National Chemical Engineering Group Corporation (hereinafter called Chengda) on EPC basis, was put into commercial operation after 168 hours of Reliability Test. This unit is the first megawatt electric generating unit exported to the overseas market, and also as another important achievement following up President Xi’s “One Belt and One Road” initiative. It only took less than 2 months to achieve the commercial operation since the first synchronization on September 12, 2019.

08 2019 ,Nov

Sichuan University-Chengda Practical Education Base Officially Inaugurated

On Nov. 8th, 2019, the inauguration ceremony of Sichuan University- Chengda Practical Education Base and the Initial Internship Kick-off Meeting was held in Chengda.

24 2019 ,Oct

Chengda Selected into the “2019 Overseas Project Benchmarking Enterprise List” of National Survey and Design Industry”

On Oct. 21st, 2019, in the “Overseas Project Benchmarking Enterprises Forum” held by China Survey and Design Association, China Chengda Engineering Co. Ltd. (hereinafter called Chengda) was selected into the “2019 Overseas Project Benchmarking Enterprise List of National Survey & Design Industry”.

China BlueChemical Ltd.

China BlueChemical Ltd.

CNOOC Natural Gas Fertilizer Project

Shenhua 1,800,000 MTPA Methanol Project

Shenhua 1,800,000 MTPA Methanol Project

China Shenhua (Baotou) Charcoal Chemical Co., Ltd.

Cilacap Expansion 1x1000MW CFSPP Project

Cilacap Expansion 1x1000MW CFSPP Project

Sinopec Qilu Petrochemical Company

PetroChina Sichuan Petrochemical Utilities and Auxiliary Facilities Engineering

PetroChina Sichuan Petrochemical Utilities and Auxiliary Facilities Engineering

Uzbekistan National Chemical Industry Corporation

山东体彩扑克3技巧